Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.
Workers Begin Filling Collapsed Tunnel at Ex-Plutonium Facility
4 Views • May 10, 2017
Description
Workers began on May 10 to fill a 20-foot by 20-foot hole created when a railroad tunnel collapsed at a decommissioned nuclear production site in Washington the day before.
The tunnel was located next to a chemical processing facility known as the Plutonium Uranium Extraction Plant, or PUREX. The site was part of the Manhattan Project, which produced the first nuclear weapons in the United States, when it was built in the 1940s. Most of its reactors were shut down between 1964 and 1971.
The rail car tunnel that collapsed on Tuesday was used to store contaminated materials, but officials said no contamination leaked from the site.
More from User
Arizona Police Horse Has Fun in the Mud After Heavy Rain
StoryfulNews
Police Arrest Drivers of Luxury Cars After Fatal Crash in Slovakia
StoryfulNews
Lucky Escape as Car Attempting to Overtake Smashes Into Oncoming Bus
StoryfulNews
Drone Footage Shows Mud-Flooded Suburb 'Wiped Out' by Tsunami
StoryfulNews
Fan Claims Newcastle Owner Mike Ashley Flicked ‘V Sign’ at Him After Meal With Squad
StoryfulNews
Residents Flee in Panic as Houses Collapse During Indonesia Quake
StoryfulNews
Related Videos
'Wedge' Tornado Sighted in Tescott, Kansas
StoryfulNews
Cold Front Rolls Through Oklahoma
StoryfulNews
Tropical Storm Sanba Brings Driving Rain to Tagbilaran City
StoryfulNews
Aerial Footage Shows Davao Mall Destroyed by Fire that Killed 38 People
StoryfulNews
Nine People Rescued From Disabled Boat in Choppy Florida Waters
StoryfulNews
Late Spring Storm Dumps Record Snowfall in Central Newfoundland
StoryfulNews