Peter Symonds College - Science Block Extension
M
Modulek LTD
6 Views • Mar 18, 2016
Description
KEY FACTS:
Client: Peter Symonds College
Project Duration: 10 weeks
Completed: September 2013
Contract Value: £650k
No of Modules: 15
Floor area: 220m²
TURNKEY ELEMENTS PROVIDED:
Design & Build
Delivery
Installation
Internal fit out
Joining to adjacent existing building
KEY BENEFITS OF USING MODULAR:
Affordable
Manufactured off-site
Minimal preparation required
Short build time
Rapid installation
Waste reduced
Minimal disruption
Modulek were tasked with rescuing a project that had run out of time for a traditional build solution. This meant coming up with a modular option to replicate the same three storey design with the minimum number of concessions all in double quick time.
Our design was put together in a matter of weeks and the off-site production commenced immediately while the busy college site was in operation. Once the summer holiday began Modulek swung into action installing the 15 modules, that uniquely came together to produce the very same building that the client had wanted from the outset, with minimal concessions to the appearance or layout. Most important of all the build completed in just six weeks on-site ready for the new term in September – an achievement that just wouldn’t have been achievable any other way other than with Modulek’s bespoke rapid service!
The facility provided a modern contrast in design to the existing building, and gave the college much needed space for science classes comprising of four laboratories, a library and a preparation room.
The most unique thing about this project was the three storey design, the third storey of modules included the roof which came in five sections fully formed to the full pitch - just placed together on top of the lower modules and jointed together – this was key to the project being completed so quickly as internal work was able to progress virtually the day after delivery – all in the dry.
Testimonial:
‘Modulek were able to turn around the design and build of the new science building in super quick time and to a high quality – very impressed with the service provided, I found both the management team and the fitters very helpful and friendly’
Senior Construction Manager
Client: Peter Symonds College
Project Duration: 10 weeks
Completed: September 2013
Contract Value: £650k
No of Modules: 15
Floor area: 220m²
TURNKEY ELEMENTS PROVIDED:
Design & Build
Delivery
Installation
Internal fit out
Joining to adjacent existing building
KEY BENEFITS OF USING MODULAR:
Affordable
Manufactured off-site
Minimal preparation required
Short build time
Rapid installation
Waste reduced
Minimal disruption
Modulek were tasked with rescuing a project that had run out of time for a traditional build solution. This meant coming up with a modular option to replicate the same three storey design with the minimum number of concessions all in double quick time.
Our design was put together in a matter of weeks and the off-site production commenced immediately while the busy college site was in operation. Once the summer holiday began Modulek swung into action installing the 15 modules, that uniquely came together to produce the very same building that the client had wanted from the outset, with minimal concessions to the appearance or layout. Most important of all the build completed in just six weeks on-site ready for the new term in September – an achievement that just wouldn’t have been achievable any other way other than with Modulek’s bespoke rapid service!
The facility provided a modern contrast in design to the existing building, and gave the college much needed space for science classes comprising of four laboratories, a library and a preparation room.
The most unique thing about this project was the three storey design, the third storey of modules included the roof which came in five sections fully formed to the full pitch - just placed together on top of the lower modules and jointed together – this was key to the project being completed so quickly as internal work was able to progress virtually the day after delivery – all in the dry.
Testimonial:
‘Modulek were able to turn around the design and build of the new science building in super quick time and to a high quality – very impressed with the service provided, I found both the management team and the fitters very helpful and friendly’
Senior Construction Manager
More from User
01:11
Modulek - School Facilities
Modulek LTD
01:51
Peter Symonds College - Science Block Extension
Modulek LTD
00:17
Bournemouth Collegiate School - Gymnasium Building
Modulek LTD
01:59
Wormley Primary School - After school club building
Modulek LTD
01:27
Jewel Academy - School Extension
Modulek LTD
04:36
Kingsleigh Primary School - School Extension
Modulek LTD
Related Videos
00:55
Peter Morgan jailed for life for murder of Georgina Symonds
ODN
07:08
'I LOVE BEING THE UNDERDOG IN THIS FIGHT' CHAS SYMONDS FOR iFILM LONDON / SYMONDS v SKEETE
IFL TV
04:15
Chas Symonds Interview for iFILM LONDON / SYMONDS v TAIT / HELLRAISER PROMOTIONS
IFL TV
04:44
CHAS SYMONDS POST-FIGHT INTERVIEW FOR iFILM LONDON / SYMONDS v STILL
IFL TV
10:16
'ITS MY CHANCE TO SHINE' - CHAS SYMONDS INTERVIEW FOR iFILM LONDON / SYMONDS v STILL
IFL TV
04:22
CHAS SYMONDS POST FIGHT INTERVIEW FOR iFILM LONDON / SYMONDS v VOLODINS
IFL TV