Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.
Hindhead Tunnel
Description
27th July 2011. The Hindhead Tunnel is a road tunnel that opened (southbound only) on 27th July 2011, four days ahead of schedule, as part of the new Hindhead bypass for the A3 road in Surrey. The northbound tunnel will open on 29th July. It forms part of the 4-mile dual-carriageway being built to replace the last remaining stretch of single-carriageway on the 68-mile London to Portsmouth road. The bypass is intended to improve road safety, reduce congestion and improve air quality. At 1.14 miles long, the tunnel is the longest non-estuarial road tunnel in the United Kingdom, and takes the road beneath the Devil's Punch Bowl, a Site of Special Scientific Interest.
Keywords & Tags
More from User
09:24
Des O'Connor with Eric and Ernie
G Pollen
32:17
People who remember Churchill's funeral
G Pollen
08:55
John Hurt (1940-2017)
G Pollen
02:52
Lord Snowdon
G Pollen
02:55
ABC Cinema Westover Bournemouth
G Pollen
27:16
Alan Rickman (1946-2016)
G Pollen
Related Videos
00:25
[Popular Books] Carpal Tunnel: How To Treat Carpal Tunnel Syndrome- How To Prevent Carpal Tunnel
Maddiebsua
02:48
Carpal Tunnel Treatment 2014: Home Carpal Tunnel Syndrome Cure (Carpal Tunnel Master Review)
Kaitlinhnh
01:10
SSH Tunnel Easy Portable Keygen (SSH Tunnel Easy Portablessh tunnel easy portable)
Stacey Asselin
00:31
[Read] Carpal Tunnel: How To Treat Carpal Tunnel Syndrome: How To Prevent Carpal Tunnel Syndrome
bates
06:54
How to draw realistic 3d tunnel || How to draw illusion 3d tunnel || Easy steps to draw realistic 3d tunnel ||
Art and Craft Channel
00:35
[Read] Carpal Tunnel: How To Treat Carpal Tunnel Syndrome: How To Prevent Carpal Tunnel Syndrome
bates