ReePrime
Flowlines Vs. for Nintendo Switch

Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.

Flowlines Vs. for Nintendo Switch

M
Melvin Hesper

6 Views • Jan 17, 2019

Description

Classic puzzle video games for 1 or 2 players.
Pair up all the matching sockets on the board by drawing continuous lines, without crossing over other lines or branching off. Cover the entire board while connecting all sockets
• Over 400 levels you can play in, in single player mode or versus multiplayer mode
• Soundtrack emphasizing on the atmosphere of the game
• 50+ amazing graphical themes
• Awesome party atmosphere
• Easy to play and hard to master.
• Both adults and children can pick up the game quickly, thanks to the Intuitive tutorial
• Play any way you like - JoyCon, Pro Controller, using the touch screen or in handheld mode.
• Get your hands on special rewards available through our Achievement System.
• 8 supported languages... English, French, Spanish, Italian, German, Portuguese, Brazilian, Turkish
https://www.nintendo.com/games/detail/flowlines-vs-switch