Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.
Defence & Diplomacy: CPEC Removing Reservations
24 Views • Jan 16, 2016
Description
To allay KP’s reservations, a steering committee under the PM has been set up to monitor the progress.
The outburst from the KP Chief Minister is serious since the CPEC is a national project, which is likely to usher major economic developments in Pakistan.
Following the epoch making visit of Chinese President Xi Jinping to Pakistan in April 2015, on May 28, an All Parties Conference (APC) had been convened by the government, during which the Federal Minister for Planning Development & Reform, Mr. Ahsan Iqbal briefed the participants to assuage doubts regarding the mega project. Resultantly, all political parties expressed full support for the project.
Examine Mr. Khattak’s qualms, prima facie, the minutes of the May 28, 2015 APC indicate the commitment to build the Western route, passing through backward areas of KP and Balochistan on priority basis. Khattak claims that the western route has been restricted only to a road, which is unacceptable to KP, while the project’s additional components including fiber optic, railway track, gas and oil pipeline, LNG and other facilities had been attached with the eastern route of the corridor to be laid between Gwadar and Rawalpindi.
Apparently, either the KP CM is not fully cognizant of the full magnitude of the project or he is being deliberately maneuvered by vested interests to sabotage CPEC. The May 28 APC talks only of the western route but KP is the beneficiary of five major aspects of the project. A new KKH is being built because the old route is congested with traffic and is the worse for wear. More than 600 Kms of the new KKH is going to pass through KP. The CM is demanding a six lane highway, which is ambitious and it is impractical to construct such a broad highway through mountains and treacherous terrain, where a dual carriage road will suffice as is the norm in most developed countries. He also claims that if the CPEC’s share for KP is only a road, the province could have built it from its own resources.
The second project, the 840 MW Suki Kinari Hydropower project is the largest private sector hydropower initiative in Pakistan. Designed to produce 2.958 GWh annually, this mega project alone is expected to substantially increase Pakistan’s existing available power generation capacity. Its groundwork is expected to commence in March 2016
Let us stop creating hurdles for completion of CPEC
Participants:
Dr. Abid Qayyum Sulehri
Jan Achakzai
Dr. Nur Fatima
Host: SM Hal
More from User
Defence & Diplomacy: Prospects of Pak-India Talks
S. M. Hali
Defence and Diplomacy: Afghan Taliban's Preconditions for Peace Talks
S. M. Hali
Defence & Diplomacy: Impact of lifting sanctions off Iran
S. M. Hali
Defence & Diplomacy: Pathankot Terror Attack & Pak-India Peace Talks
S. M. Hali
Defence & Diplomacy: CPEC Removing Reservations
S. M. Hali
Defence & Diplomacy: Pak-Afhan Dialogue
S. M. Hali
Related Videos
CM Balochistan Speech 13 November 2016 #SanaullahZehri #CPEC #Balochistan #PAKChina #Gawadar #PAKChineFriendship
Ailaan TV
Let's show the world that this is our Balochistan 🇵🇰 Gawadar marine drive Balochistan Pakistan 🇵🇰 📽Asad Mumtaz
Pakistan 🇵🇰 Diaries
CPEC: Gawadar City Project | Pakistan 2016
Pakistan
CPEC Passenger Bus Service (Pakistan-China) have start up from Lahore to Kashgar
ARY NEWS
CPEC Passenger Bus Service (Pakistan-China) have start up from Lahore to Kashgar
Awaz Today
CPEC Gawadar City Project Pakistan Progress 2016
Irfa0315