Estimate the actual Bucket Load, in bank cubic meters (BCM), for a loader bucket whose heaped capacity is 3.82 m^3The soil’s bucket fill factor is 0.9 and its loader factor is 0.8
-
paki pindot po sa "LIKE" button mga Engr.
and click SUBSCRIBE na rin po if hindi pa po kayo naka "SUBSCRIBE"

Maraming salamat po sa inyo mga Engineers and Future Engineers.
mabuhay po kayong lahat.
-
FB Page - https://www.facebook.com/MrComputerCiviLEngineer
Tiktok - https://www.tiktok.com/@SolUsmanJr
-------------
CREDIT:
-------------
Soundtrack:
Ace Attorney Dual Destinies - Apollo Justice (I'm fine)
Ace Attorney Spirit of Justice (Credit Theme)

Avatar:
SuperME Cartoon Avatar Maker (mobile app)

Reference:
"Licensure Exams for Civil Engineering" by BESAVILLA
"CE Reference for Licensure Examination" by GILLESANIA
-
#SolUsmanJr
#ceboardexam
#civilengineeringlicensureexam