CE Board MSTE Problem 6 (Engineering Mathematics) - CE Nov 2021

Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.

CE Board MSTE Problem 6 (Engineering Mathematics) - CE Nov 2021

S
Sol Usman Jr

70 Views • Mar 14, 2024

Description

CE NOV 2021 - Estimate the hourly production in loose volume (LCM) of a 2.68 m^3 wheel loader, excavating sand and gravel (average material) from a pit and moving it to a stockpile. The average haul distance is 61 m .Effective Grade is 6%, bucket fill factor is 1.0 , and Job efficiency is 50 min/hr
Basic Time Cycle = 0.50 min
Travel Time = 0.30 min
-
paki pindot po sa "LIKE" button mga Engr.
and click SUBSCRIBE na rin po if hindi pa po kayo naka "SUBSCRIBE"

Maraming salamat po sa inyo mga Engineers and Future Engineers.
mabuhay po kayong lahat.
-
FB Page - https://www.facebook.com/MrComputerCiviLEngineer
Tiktok - https://www.tiktok.com/@SolUsmanJr
-------------
CREDIT:
-------------
Soundtrack:
Ace Attorney Dual Destinies - Apollo Justice (I'm fine)
Ace Attorney Spirit of Justice (Credit Theme)

Avatar:
SuperME Cartoon Avatar Maker (mobile app)

Reference:
"Licensure Exams for Civil Engineering" by BESAVILLA
"CE Reference for Licensure Examination" by GILLESANIA
-
#SolUsmanJr
#ceboardexam
#civilengineeringlicensureexam