Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.
Work on reflecting pool in Washington done
Description
The Lincoln Memorial Reflecting Pool refurbishment project in Washington is almost completed as water is being filled up in the new pool smarting the "American flag blue colours".
The pool is expected to be reopened for the July 4 Independence Day celebration in conjunction with the 250th anniversary of the United states.
WATCH MORE: https://thestartv.com/c/news
SUBSCRIBE: https://cutt.ly/TheStar
LIKE: https://fb.com/TheStarOnline
The pool is expected to be reopened for the July 4 Independence Day celebration in conjunction with the 250th anniversary of the United states.
WATCH MORE: https://thestartv.com/c/news
SUBSCRIBE: https://cutt.ly/TheStar
LIKE: https://fb.com/TheStarOnline
More from User
01:47
Stocks surge, oil tumbles after news of Iran-US deal
The Star
01:17
Fatal Karak crash: Lorry driver tests positive for drugs, say cops
The Star
19:09
Star Sportcast | EP2: Will it come home for England?
The Star
01:29
Baby among four dead after lorry crushes car in Bentong
The Star
01:12
Search continues for two missing fishermen near Kemaman
The Star
04:30
Court greenlights Highland Towers blocks demolition by year-end
The Star
Related Videos
06:08
Telcos upgrading 3G transmitter stations to 4G, says Deputy Communications Minister
The Star
02:48
Education Ministry upgrading 384 education institutions as centres of excellence
The Star
13:12
Asean conclude talks on upgrading ACFTA, Atiga, says Tengku Zafrul
The Star
01:21
Ismail Sabri meets Japanese counterpart, proposes upgrading ties
The Star
03:58
LTSIP upgrading project expected to complete next year, says Loke
The Star
01:44
River upgrading works linked to Jalan 223 flash floods, says PJ mayor
The Star