Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.
[STS-134] Launch Status Briefing (01/05/11)
Description
Mike Moses and Mike Leinbach held a meeting to update press on the launch status for Space Shuttle Endeavour, STS-134.
The problem was determined to be a power issue in an LCA Box inside the Avonics Bay, That requires going inside Endeavour which will take a while. No new launch date has been set due to the R&R retesting required on the new LCA box when installed.
The problem was determined to be a power issue in an LCA Box inside the Avonics Bay, That requires going inside Endeavour which will take a while. No new launch date has been set due to the R&R retesting required on the new LCA box when installed.
More from User
02:29:26
Late.Night.Lycett.Episode.4
SpaceVids
02:56
HOME VIDEOS 2020 - Go Ape - GoPro - Part 2
SpaceVids
20:00
SpaceX - Falcon 9 - Flight 149 - Starlink Group 4-14 - SpaceX 4K
SpaceVids
15:03
Expedition 58 Crew Prepare for Launch to Space Station
SpaceVids
54:01
Mars InSight Team Discuss Successful Landing with Media
SpaceVids
12:26
Mars Insight Lander Touches Down on Mars
SpaceVids
Related Videos
12:05
[STS-134] Launch of Space Shuttle Endeavour
SpaceVids
14:32
[STS-134] May 16th Set as New Launch Date in Launch Status Briefing
SpaceVids
07:21
[STS-134] Shuttle Endeavour Performs RPM
SpaceVids
09:37
[STS-134] Shuttle Endeavour Docks to ISS For Final Time
SpaceVids
01:43
[STS-134] Technicians Test Removed Faulty Power Box From Shuttle Endeavour
SpaceVids
12:37
[STS-134] Crew Egress from Shuttle Endeavour
SpaceVids