Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.
Soyuz launch site construction
0 Views • Aug 19, 2015
Description
This dry run ensured that the Soyuz and the new facilities work together perfectly, while allowing the teams to train under realistic launch conditions. It also validated all the procedures during the final phase before launch, except the fuelling of the vehicle.
The vehicle was transferred from the preparation building to the launch zone and erected into the vertical position. The mobile gantry was then rolled out to the pad and the vehicle's upper composite, comprising the Fregat upper stage and payload fairing, was hoisted on top of the launcher.
The campaign ended with a simulated liftoff and flight downrange.
More from User
Earth from Space: Sagaing Division, Myanmar
European Space Agency, ESA
Launching satellites from Space Station – step one
European Space Agency, ESA
Spacewalker’s view
European Space Agency, ESA
Launching satellites from Space Station – step two
European Space Agency, ESA
Introducing ESA’s new astronaut Matthias Maurer
European Space Agency, ESA
Ariane 6
European Space Agency, ESA
Related Videos
Galileo 7 & 8 Soyuz launch overview
European Space Agency, ESA
Soyuz to launch new pair of Galileo satellites
European Space Agency, ESA
Fully-integrated Soyuz on launch pad
European Space Agency, ESA
First Soyuz transfer to launch pad at Europe's Spaceport
European Space Agency, ESA
The Soyuz launch sequence explained
European Space Agency, ESA
First Soyuz transfer to launch pad at Europe's Spaceport
European Space Agency, ESA