Pasig-Marikina River Channel inspection

Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.

Pasig-Marikina River Channel inspection

T
The Manila Times

1,478 Views • Aug 11, 2025

Description

Pasig-Marikina River Channel inspection

President Ferdinand Marcos Jr. leads the inspection of the installation of the Pasig-Marikina River Channel Improvement Project Phase IV in Marikina City. Led by the Department of Public Works and Highways in partnership with the Japan International Cooperation Agency, the project aims to reduce flooding caused by the overflow of the Pasig and Marikina rivers.

Phase IV involves the construction of dikes and revetments, installation of floodgates and dredging channels to improve the flood management infrastructure of the National Capital Region, Malacañang said

VIDEO BY MPC Pool

Subscribe to The Manila Times Channel - https://tmt.ph/YTSubscribe
Visit our website at https://www.manilatimes.net

Follow us:
Facebook - https://tmt.ph/facebook
Instagram - https://tmt.ph/instagram
Twitter - https://tmt.ph/twitter
DailyMotion - https://tmt.ph/dailymotion

Subscribe to our Digital Edition - https://tmt.ph/digital

Check out our Podcasts:
Spotify - https://tmt.ph/spotify
Apple Podcasts - https://tmt.ph/applepodcasts
Amazon Music - https://tmt.ph/amazonmusic
Deezer: https://tmt.ph/deezer
Stitcher: https://tmt.ph/stitcher
Tune In: https://tmt.ph/tunein

#themanilatimes
#tmtnews
#philippines