ReePrime
P527 at Ashland

Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.

P527 at Ashland

M
Matthew Betzner

465 Views • May 06, 2007

Description

At around 6:30 PM, MBTA Train P527 Rolls into Ashland. The Train was running on the track 2 and was switched back to 1. The reason is that the operation between Framingham and near Newton during peak hour is different, from 4:30 PM to 7:30, inbound trains use the outbound track, the outbound trains use the inbound track. P527 is one of two peak hour trains on the Worcester line to make all the stops from Boston to Worcester and covers the line in 90 minutes, It will tie up at Worcester for the night. The detector is heard once again.