video not played or not found error
click on direct switch
Hosted by Dailymotion. For legal issues: Copyright Center · DMC · Instant Removal
How to Manage a Bathroom Remodel
Description
Calculate Your Buyer Closing Costs: https://www.hauseit.com/closing-cost-calculator-for-buyer-nyc/
The steps to renovating a bathroom in NYC include: demolition, framing, electrical work, plumbing, sheetrock and cement board, waterproofing and leveling, tiling and touch-ups.
Demolition
A bathroom demo for an averaged size bath in NYC takes two to three days. There is a lot of dust and noise involved, especially if the bathroom being demolished has fully-tiled walls, a cast-iron bathtub and/or lots of cement-board backing or poured concrete on the walls or floors.
Demolition also creates a tremendous amount of trash. A typical 100 sqft bathroom demo can create up to 150 large, black bags of trash. The cost of simply disposing of the trash can exceed $1,000.
Framing
Framing consists of building out any walls in the bathroom (such as for a closet or laundry area) in addition to framing the shower body. Framing typically takes two to three days.
Because framing is one of the most structurally important parts of a bathroom renovation, it’s important for you to physically monitor the construction work to make sure everything is properly level.
Electrical Work
Redoing the electrical in a typical NYC bathroom takes just a day or two. The cost of replacing outlets, a GFCI upgrade and bringing in new lines for a washer/dryer connection is usually no more than $2,000.
Plumbing
Redoing the plumbing in a bathroom typically takes three to five days. The scope of work and cost will vary dramatically depending whether or not you’re moving the location of any fixtures.
Expect to pay more for plumbing if you’re installing a double-sink vanity, installing both a shower head and hand shower, and/or relocating/extending drain and water lines in the bathroom.
Sheetrock and Cement Board
Once framing done, the next step is to install sheetrock and/or cement board against the frame. Contractors typically use green sheetrock or cement board in the shower body, as these are more resilient to water compared to traditional sheetrock. The highest quality contractors will only use cement board in the shower body.
Waterproofing and Leveling
Once framing and sheetrock is done, the next step is to waterproof the floors and walls and level the bathroom floor. The easiest way to waterproof the shower body is to apply a waterproofing membrane such as RedGard. This is applied with a roller in the same way traditional paint is applied.
Looking to buy or sell a home in New York? Learn how you can save on commission and closing costs at https://www.hauseit.com
Save Money with a Hauseit Buyer Closing Credit: https://www.hauseit.com/hauseit-buyer-closing-credit-nyc/
#hauseit #hauseitnyc
https://www.hauseit.com
More from User
How Much Are New Development Closing Costs in NYC?
Hauseit
Where Do Co-op Apartment Square Footage Figures Come From?
Hauseit
Pros and Cons of Buying a Home Without Your Spouse
Hauseit
Hauseit NYC Buyer Agent Commission Rebate Review - Ahsan A.
Hauseit
Hauseit Agent Assisted FSBO Review for NYC - Seller Ilven S. | Hauseit® Testimonial
Hauseit
How to Choose a Real Estate Lawyer in NYC
Hauseit
Related Videos
Bathroom Remodel Austin|Remodel Bathroom Austin|Austin Bathroom Remodel
abbysXpad
Bathroom Remodel South Bend - South Bend Bathroom Remodel
davesipp
Bathroom Remodeling Columbus Ohio,Bathroom Remodel Columbus
cheih127
Bathroom Remodeling Torrance, Remodel Bathroom Torrance CA
tpgremodelers
Bathroom Remodel Granger - Granger Bathroom Remodel - Best Prices
davesipp
Bathroom Remodeling Santa Monica - Bathroom Remodel Company
contractor deal