video not played or not found error
click on direct switch
Hosted by Dailymotion. For legal issues: Copyright Center · DMC · Instant Removal
ExoMars Progress Update
1 Views • Oct 18, 2019
Description
However, there remain some important challenges ahead for the parachute system of the descent module. Recent balloon high-altitude drop tests were unsuccessful. As a result, the next and final two drop tests, scheduled between January and March 2020, must be fully successful otherwise the mission cannot launch in 2020.
The joint ESA and Russian mission consists of four elements: a carrier module to propel the spacecraft to Mars, a descent module, a surface science platform and the Rosalind Franklin rover, which will use its drill up to depths of two meters to search for signs of life.
More information on ExoMars: http://www.esa.int/exomars
More from User
NASA's Swift Mission Gets a Boost
Michael500ca
Artemis II Launches To The Moon
Michael500ca
NASA’s Day of Remembrance 2026
Michael500ca
A mission for the Rosalind Franklin rover
Michael500ca
NASA’s Day of Remembrance 2025
Michael500ca
Tonight's Sky - December 2024
Michael500ca
Related Videos
Cannes : des salariés de l'espace Thales Alenia se heurtent à sa direction, bloquant l'accès au site
MediaActuY
Bâtir et promouvoir une souveraineté numérique nationale et européenne : M. Rodolphe Belmer (Eutelsat), M. Hervé Dereey (Thales Alenia Space) ; Représentants des sociétés Atos et IN Groupe - Mardi 6 avril 2021
Assemblée nationale
ROBERTO GUALTIERI VISITA LA SPACE FACTORY DI THALES ALENIA
Radio Roma
Nasce in Italia la Space Factory 4.0 di Thales Alenia Space e Asi
Askanews
Border - Promo - Thales Alenia
Financialounge
SPACETV - Bignami sulla ISS e Thales Alenia Space
SpaceTVItaly