Hosted by Dailymotion. For legal issues report at the Copyright Center, report us on DMC, or use the Instant Removal tool.
Boeing Completes Certification Testing for New 787 Battery System
Description
SUBSCRIBE!
Learn about EV technology: http://www.electric-vehiclenews.com/
Boeing (NYSE:BA) completed a 787 certification demonstration flight today on line number 86, a Boeing-owned production airplane built for LOT Polish Airlines. Today's flight marks the final certification test for the new battery system, completing the testing required by the U.S. Federal Aviation Administration (FAA).
Today's flight departed from Paine Field in Everett, Wash. at 10:39 a.m. Pacific with a crew of 11 onboard, including two representatives from the FAA. The airplane flew for 1 hour and 49 minutes, landing back at Paine Field at 12:28 p.m. Pacific.
The crew reported that the certification demonstration plan was straightforward and the flight was uneventful. The purpose of the flight was to demonstrate that the new battery system performs as intended during normal and non-normal flight conditions.
Boeing will now gather and analyze the data and submit the required materials to the FAA. We expect to deliver all of the materials to the FAA in the coming days. Once we deliver the materials we stand ready to reply to additional requests and continue in dialog with the FAA to ensure we have met all of their expectations.
Learn about EV technology: http://www.electric-vehiclenews.com/
Boeing (NYSE:BA) completed a 787 certification demonstration flight today on line number 86, a Boeing-owned production airplane built for LOT Polish Airlines. Today's flight marks the final certification test for the new battery system, completing the testing required by the U.S. Federal Aviation Administration (FAA).
Today's flight departed from Paine Field in Everett, Wash. at 10:39 a.m. Pacific with a crew of 11 onboard, including two representatives from the FAA. The airplane flew for 1 hour and 49 minutes, landing back at Paine Field at 12:28 p.m. Pacific.
The crew reported that the certification demonstration plan was straightforward and the flight was uneventful. The purpose of the flight was to demonstrate that the new battery system performs as intended during normal and non-normal flight conditions.
Boeing will now gather and analyze the data and submit the required materials to the FAA. We expect to deliver all of the materials to the FAA in the coming days. Once we deliver the materials we stand ready to reply to additional requests and continue in dialog with the FAA to ensure we have met all of their expectations.
More from User
02:15
Audi TT Plug-In Hybrid AWD offroad SUV concept
tsport100
04:23
Kia Soul EV @ 2014 Geneva Motor
tsport100
03:54
Renault ZOE EV wins Monte Carlo ZENN Rally
tsport100
01:14
Electromagnetic Railgun accelerates projectiles to 8,500 km/h (Mach 7)
tsport100
05:03
BMW i8 Lightweight Carbon Fiber Design:
tsport100
03:18
BMW X5 Plug-In Hybrid
tsport100
Related Videos
01:03
Watch: Boeing 787 completes its first commercial flight
NDTV
02:00
Software Testing V Model | Software Testing Certification | CTFL Training
Tech
00:48
Boeing confident on 787 battery fix
euronews (in English)
01:11
Investigators ponder Boeing 787 battery problems
Reuters
01:48
Boeing: Dreamliner 787 battery problem is solved
Al Jazeera English
00:54
Boeing 787 battery fire probe points to one cell: NTSB
AFP English