Loading formats...
Army Engineers Build Floating Bridge
Description
U.S. Army Engineers demonstrate their capabilities utilizing the Improved Ribbon Bridge (IRB).
The Improved Ribbon Bridge (IRB) enables Soldiers to cross rivers, lakes, or other bodies of water in the absence of a means of crossing or in the event of an unreliable or damaged permanent bridge. The IRB can be configured as either a continuous full-closure bridge or assembled and used for rafting operations.
The Improved Ribbon Bridge (IRB) enables Soldiers to cross rivers, lakes, or other bodies of water in the absence of a means of crossing or in the event of an unreliable or damaged permanent bridge. The IRB can be configured as either a continuous full-closure bridge or assembled and used for rafting operations.
Discover more
Keywords & tags
More from this user
05:54
There are too many light to create from this link
News bing
03:05
ARTIFICIAL INTELLIGENCE - AI
News bing
03:06
Creative ideas from cement and brick !
News bing
01:29
Alcoholic Husband
News bing
04:01
Use rifles to confront Japanese armored vehicles
News bing
08:13
Clever tactics
News bing
Related videos
14:00
Multi-Role Bridge Company - Army Engineers Build Floating Bridge
Moon Land Studio
06:28
U.S Marines • Combat Engineers • Door Breaching Training
The Military Channel
01:03
U.S. Marines Engineers get familiar with Autonomous Robotics
The Military Channel
01:03
U.S. Marines Engineers get familiar with Autonomous Robotics
The Military Channel
06:08
U.S Marines • Combat Engineers • Door Breaching Training
The Military Channel
03:17
US Military News • U.S. Marines Combat Engineers Conduct Breaching Range
The Military Channel